Turnkey station
Gas analysers, rpm meters, PCs, software and cameras. Installation, calibration and data connection.
Sao Viet Phat delivers turnkey emission testing stations for motorcycles and mopeds: QCVN 103:2024-compliant equipment, software connected to the Vietnam Register, licensing dossiers and inspector training.
Hanoi & HCMC start motorcycle emission testing on 01/07/2027. Pick a province to see its date.
[Placeholder figures – replace with company data]
Each model needs a different equipment scale, floor plan and financing. We tailor the station to yours.
Keep customers coming back: service, emission testing and certification in one place.
A compact package for small premises. Vehicles that fail can be repaired on the spot.
Get ahead of demand for ~5,000 sites. A standardised, replicable model with central management.
Gas analysers, rpm meters, PCs, software and cameras. Installation, calibration and data connection.
Floor-plan advice under Decree 166/2024 and QCVN 103:2024; dossier preparation through to certification.
Emission testing procedures, equipment and software operation; support with inspector certification.
Standard model, brand, centralised software and revenue-sharing options.
Premises, traffic, existing staff
Lane and waiting-area layout per QCVN 103:2024
Supply, install and calibrate
Inspectors and front-desk staff
Certificate of eligibility dossier
Data to the Vietnam Register, maintenance
Drag the sliders for a quick estimate.
Assumptions: VND 300M investment per lane, VND 25M monthly operating cost, 26 working days. The maximum fee is set by the Ministry of Construction; figures are illustrative only.
Per Decision 13/2026/QĐ-TTg and QCVN 99:2025/BNNMT. Each locality allows 18 months from its start date for vehicles to be tested.
QCVN 99:2025/BNNMT sets 4 CO/HC limit levels. Circular 30/2026/TT-BXD sets test procedures.
Circular 92/2025/TT-BNNMTMotorcycle emission testing begins.
Decision 13/2026/QĐ-TTgMotorcycles in Hanoi and HCMC must meet Level 2 or higher.
Decision 13/2026/QĐ-TTgHai Phong, Da Nang, Hue, Can Tho begin testing.
Decision 13/2026/QĐ-TTg28 provinces; may start earlier by local decision.
Decision 13/2026/QĐ-TTgLeave your details and our engineer will call you back within 24 working hours.